01964 544480 / info@samuelkendall.co.uk

East Yorkshire Eco-House: Passivhaus New-Build & Wolds Chalk Home

Designed by Samuel Kendall Associates, East Yorkshire Eco-House is a Passivhaus-standard new-build family home in Carnaby, near Bridlington on the edge of the Yorkshire Wolds.

The design pairs a low-carbon, super-insulated timber frame structure with a distinctive Wolds chalk stone outer skin and traditional red clay pantiles to reflect the surrounding East Riding village vernacular.

Combining passive solar design strategies, high levels of airtightness, and integrated renewable energy systems, the home dramatically cuts operational energy demand and embodied carbon while fostering healthy, nature-connected family living.

Project Key Facts

 
  • Location: Carnaby, Bridlington, East Riding of Yorkshire

  • Local Planning Authority: East Riding of Yorkshire Council

  • Project Type: New-Build Sustainable Detached Family Home (2020 – 2022, Completed)

  • Design Standard: Passivhaus Standard & Passive Solar Design

  • Construction System: Low-carbon insulated timber frame with locally harvested Wolds chalk stone cladding and red clay pantile roof

  • Renewable & M&E Systems: High-efficiency thermal envelope, airtight construction, and integrated renewable energy systems

  • Key Architectural Features: Reclaimed Wolds chalk outer skin, East Riding village street frontage, south-facing passive solar orientation, and garden-connected family living spaces

 

How Were Local Wolds Chalk and Reclaimed Cottage Materials Reused at East Yorkshire Eco-House?

Our project began with the dream that a home once full of family memories, childhood holidays, and the joy of connecting to nature could come to life again—creating a tranquil family home that is kind to the environment and celebratory of its village heritage.

Once the post office cottage to the village of Carnaby on the edge of Bridlington, the site had stood empty for several years.

The existing cottage was in poor condition and could not meet the complex needs of a multi-generational modern family. We took the careful approach of dismantling the cottage and salvaging its unique masonry skin of local Wolds chalk and whitewashed brick for reuse in the new house—preserving the home's local material character while significantly lowering both the embodied carbon and material cost of the project.

The original disused Post Office cottage in Carnaby near Bridlington prior to careful dismantling, showing the locally quarried Wolds chalk stone masonry, whitewashed brickwork, dentil eaves, and slate roof whose chalk stone and brick were reclaimed and reused in East Yorkshire Eco-House.

 

Interior view of the open-plan living and dining space at East Yorkshire Eco-House in Carnaby near Bridlington, where a central thermal spine of natural stone forms the base for a bespoke timber staircase with integrated shelving—reminiscent of the intricate cabinetry of the original village post office—set over terrazzo flooring with views out to the garden.

 

How Do Stack Ventilation and Thermal Mass Achieve Passivhaus Comfort at East Yorkshire Eco-House?

This home is made with the ambition of being highly sustainable, with close attention paid to its low carbon timber structure, passive solar design strategies and renewable energy systems vital to achieving an eco-friendly home meeting the Passivhaus standard.

The house is arranged to maximise its relationship to a verdant, expansive garden and bring natural light into the home. A central, double-height living space creates the optimal conditions for stack effect ventilation to naturally ventilate the home.

A ground floor finish of terrazzo and a central natural stone chimney create significant thermal mass in the home, stabilising internal temperatures and lowering the home’s reliance on artificial heating. 

 

How Does the Building Layout Shield the South Garden from Northern Road Noise?

A unique challenge of this site was creating a tranquil garden oasis to the south despite a busy, noisy road running along the north boundary. To solve this, our design stretches across the northern edge of the site—acting as an acoustic buffer that blocks road noise and shelters the south-facing garden.

 

Central solar living space at East Yorkshire Eco-House in Carnaby near Bridlington, combining a central natural stone chimney spine and speckled terrazzo flooring for thermal mass with large timber-framed windows, overhead solar shading, and natural stack-effect ventilation to create a healthy indoor environment.

 

How Does East Yorkshire Eco-House Eliminate Fossil Fuels and Prevent Summer Overheating?

Renewable systems including an Ecodan air source heat pump, a mechanical ventilation heat recovery system and battery storage remove the home’s reliance on fossil fuel energy whilst achieving the healthiest internal environment for the family.

As the UK continues to experience record summer temperatures and move from a temperate northern european climate to a climate similar to the south of France we believe all new home’s must pay close attention to the dangers of overheating, integrating solutions into their design to minimise costs incurred in the future.

South-facing garden elevation of East Yorkshire Eco-House in Carnaby near Bridlington, showing the perforated aluminium solar shading canopy casting dappled shade across the brick-paved veranda terrace, bi-folding patio doors, Wolds chalk masonry, and landscaped lawn.

 

This project integrates a perforated aluminium canopy across its south-facing elevation, shading the interior from the high angles of summer sun whilst permitting low winter sun to harvest solar heat in the colder months. Bi-folding doors and a south-facing veranda allow family life to seamlessly flow out into the garden, dissolving the boundary between inside and outside.

 
 

How Was Reclaimed Wolds Chalk Combined with Salvaged and New Brick at East Yorkshire Eco-House?

Our in-house visualisation skills allowed us to quickly iterate and explore a range of different material options—blending existing chalkstone and brickwork harvested on-site with new bricks added where necessary for damp-proof coursing and external veranda paving.

The final material palette uses a light grey brick for the damp-proof course at the base of the walls and the veranda's pavers, paired with site-harvested brickwork around the windows and across the walls of the home's single-storey west wing.

 
Chosen material palette render for East Yorkshire Eco-House near Bridlington, pairing site-harvested warm red brick on the west wing with Wolds chalk walls, grey brick pavers, and a perforated canopy.

Chosen material palette for East Yorkshire Eco-House in Carnaby near Bridlington, pairing site-harvested warm red brickwork on the single-storey west wing with reclaimed Wolds chalk masonry, light grey brick damp-proof coursing and veranda pavers, and the perforated aluminium shading canopy.

 
 

On-site material reclamation during the careful dismantling of the original Post Office cottage at East Yorkshire Eco-House in Carnaby near Bridlington, exposing the historic Wolds chalk stone blocks, red clay brickwork, and aged timber window frame salvaged for reuse in the new home.

How Were Chalk Stone and Brickwork Salvaged During On-Site Material Reclamation?

Rather than demolishing the disused Post Office cottage to landfill, we carefully dismantled the structure by hand to salvage its traditional Wolds chalk stone and red clay brickwork on-site.

By exposing, separating, and cleaning the historic masonry blocks for direct reuse in the new build, the project retained the authentic material patina of the Carnaby village site while cutting embodied carbon, transport emissions, and new material costs.

 

How Was the Salvaged Wolds Chalk Stone Prepared and Rebuilt into the New Facade?

Once dismantled from the original Post Office cottage, the salvaged Wolds chalk blocks were sorted, cleaned of loose mortar, and stockpiled on-site ready for reuse.

Our contractor team then dressed and re-laid the reclaimed chalk in breathable lime mortar to form the new home's distinctive outer skin—wrapping the super-insulated timber frame in a durable, moisture-permeable facade that honours East Riding building traditions while keeping material transport emissions to zero.

Stockpile of rough-hewn Wolds chalk stone blocks salvaged on-site from the dismantled Post Office cottage at East Yorkshire Eco-House in Carnaby near Bridlington, sorted and ready to be dressed and re-laid in breathable lime mortar for the new home's exterior facade.

 
Pile of salvaged Wolds chalk stone blocks in the foreground with neatly stacked reclaimed red clay bricks behind, recovered on-site at East Yorkshire Eco-House in Carnaby near Bridlington.

Salvaged masonry stockpiled on-site at East Yorkshire Eco-House in Carnaby near Bridlington: rough-hewn Wolds chalk stone blocks in the foreground and neatly stacked red clay bricks with traces of historic whitewash behind, all carefully recovered from the dismantled Post Office cottage for zero-mile reuse in the new home's exterior walls.

 

How Were the Foundations and Structural Steel Elements Engineered at East Yorkshire Eco-House?

To create a level, thermally insulated base capable of supporting both the super-insulated timber frame and the heavy reclaimed Wolds chalk outer skin, construction began with a beam-and-block ground floor foundation and perimeter masonry upstand.

Targeted structural steelwork was introduced only where long spans and lateral wind bracing were required—supporting the open-plan, double-height central living space and wide south-facing garden glazing while keeping overall embodied carbon low.

Construction stage at East Yorkshire Eco-House in Carnaby near Bridlington, showing the completed beam-and-block ground floor foundation and two-storey structural steel portal frame erected to carry the open-plan double-height living area and wide south-facing glazing—with a team member in a hard hat and a site dog standing on the slab for scale.

 

Wider site view during early construction at East Yorkshire Eco-House in Carnaby near Bridlington, showing the beam-and-block ground floor slab, perimeter masonry upstands, and two structural steel portal frames erected along the Main Street frontage.

How Do the Steel Portal Frames and Timber Frame Work Together as a Hybrid Structure?

Two slender structural steel portal frames anchored into the beam-and-block foundation provide lateral wind bracing along the exposed northern street frontage and support the main roof ridge.

By concentrating steel only where long structural spans are required, the rest of the superstructure could be built from low-carbon timber studwork—minimising embodied carbon and avoiding heavy concrete lintels that cause thermal bridging.

 
CONSTRUCTION UPDATE 01_03_EAST YORKSHIRE PASSIVHAUS_SUSTAINABLE YORKSHIRE ARCHITECTS_SAMUEL KENDALL ASSOCIATES.jpg
 

How Does the Underground Rainwater Harvesting System Reduce Mains Water Use at East Yorkshire Eco-House?

To minimise mains water consumption and reduce surface-water runoff, an underground rainwater harvesting tank and drainage network were installed during the groundworks phase.

Rainwater collected from the pitched roof is filtered and stored below ground before being pumped back into the home via dedicated supply pipework for non-potable uses—such as WC flushing, laundry, and garden irrigation—supporting the home's holistic approach to resource efficiency.

 
South garden elevation of East Yorkshire Eco-House under construction near Bridlington, showing the central pitched steel gable frame, foil-insulated timber walls, roof rafters, and stacked blocks.

Frontal south garden elevation during construction at East Yorkshire Eco-House in Carnaby near Bridlington, illustrating the central pitched steel gable portal frame flanked by two-storey volumes and the single-storey west wing—all wrapped in continuous silver foil-faced rigid insulation with taped airtight seams, exposed timber roof rafters, and temporarily weather-screened openings ahead of installing the reclaimed Wolds chalk stone outer skin.

 

Corner street perspective during construction at East Yorkshire Eco-House in Carnaby near Bridlington, showing the foil-insulated two-storey main volume and single-storey west wing with exposed timber roof rafters integrating into the village streetscape.

Why Was a Super-Insulated Timber Frame Chosen for East Yorkshire Eco-House?

Using a precision timber-frame superstructure allowed the building envelope to become weathertight rapidly on-site while locking away biogenic carbon compared to conventional masonry-only construction.

Combined with continuous external rigid insulation and open-web floor joists, the timber system achieves Passivhaus-standard thermal efficiency and airtightness while keeping overall wall thicknesses proportional to the surrounding Carnaby village streetscape.

 

How Was Continuous Insulation and Airtightness Achieved Across the Building Envelope?

Once the timber superstructure was erected, the entire building envelope was wrapped externally in continuous foil-faced rigid insulation boards with meticulously taped joints.

This external thermal wrap eliminates cold bridging through the timber studs and establishes a continuous Passivhaus-grade airtight barrier above the blockwork plinth—ready for the reclaimed Wolds chalk stone outer skin to be laid around it.

 

Street-side elevation during construction at East Yorkshire Eco-House in Carnaby near Bridlington, showing the two-storey timber frame and single-storey west wing completely wrapped in continuous silver foil-faced rigid insulation boards with taped airtight joints prior to laying the reclaimed Wolds chalk stone outer skin.

 
Rear garden construction view of East Yorkshire Eco-House near Bridlington, showing the foil-insulated timber frame with taped seams, exposed roof rafters, steel ridge beams, and stacked blocks.

Rear south garden elevation during construction at East Yorkshire Eco-House in Carnaby near Bridlington, illustrating the single-storey west wing and two-storey gabled volumes wrapped in continuous silver foil-faced rigid insulation with taped airtight joints, exposed timber roof rafters on structural steel ridge beams, temporarily weather-screened openings, and stacked masonry materials ready for the reclaimed Wolds chalk stone outer skin.

 

Double-height central living volume under construction at East Yorkshire Eco-House in Carnaby near Bridlington, highlighting the soaring OSB-sheathed timber-frame walls, pitched roof structure, steel support beam with open-web ceiling joists in the foreground, and beam-and-block floor designed to enable natural stack-effect ventilation.

 
 
 

Interior structural framing at East Yorkshire Eco-House in Carnaby near Bridlington, showing a flush structural steel beam spanning between the double-height living space and the single-storey west wing, topped by open-web metal ceiling joists, OSB-sheathed timber stud walls, stacked timber stored on the beam-and-block floor, and builders working in the adjoining room.

 
Ground-floor timber frame interior at East Yorkshire Eco-House near Bridlington, showing the concrete foundation pad for the central stone chimney, timber ceiling joists, and south garden opening.

Full-width interior construction view along the ground floor of East Yorkshire Eco-House in Carnaby near Bridlington, showing the concrete foundation pad for the central natural stone thermal spine, beam-and-block floor, OSB-sheathed timber stud walls, timber ceiling joists carried on a structural steel beam, and the full-height steel-framed south garden opening.

 
First-floor timber frame interior at East Yorkshire Eco-House near Bridlington, showing metal-web ceiling posi-joists, OSB-sheathed stud walls, timber floorboards, and braced window openings.

First-floor timber frame construction at East Yorkshire Eco-House in Carnaby near Bridlington, showcasing engineered metal-web posi-joists spanning the ceiling for effortless MVHR ductwork routing, OSB-sheathed stud walls, timber floorboards, and temporarily braced window openings.

 
 
 
Interior construction view of East Yorkshire Eco-House near Bridlington, showing a concrete hearth foundation pad, beam-and-block floor, timber stud walls, and steel-framed garden opening.

Interior construction view looking south through the double-height living space at East Yorkshire Eco-House in Carnaby near Bridlington, showing the dedicated concrete foundation pad for the central natural stone thermal spine, beam-and-block floor, OSB-sheathed timber stud walls, and full-height steel-framed garden opening.

 
Construction view of East Yorkshire Eco-House near Bridlington, showing a pitched steel gable frame and ridge beam infilled with timber studwork between OSB-sheathed timber walls and scaffolding.

Upper-level structural framing at East Yorkshire Eco-House in Carnaby near Bridlington, showing the pitched steel gable portal frame and central steel ridge beam infilled with precision timber studwork, flanked by OSB-sheathed timber-frame side walls and temporary scaffolding overlooking the south garden.